Balboa-water-group Slimline Air Controls 10-2510 User Manual

Browse online or download User Manual for Accessories for water Balboa-water-group Slimline Air Controls 10-2510. Balboa Water Group Slimline Air Controls 10-2510 Manuel d'utilisation [en] [de] [es] [fr] [it]

  • Download
  • Add to my manuals
  • Print
  • Page
    / 2
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
40725 Rev A July 30, 2009
SLIMLINE AIR CONTROLS 10-2310-(-) & 10-2510-(-)
Material
White ABS/grey ABS
Dimensions
Hole size Socket size
10-2510-(-): 1 1/16” 20 mm
10-2310-(-) 1 11/16” 32 mm
Important
Follow the directions for installation and connection. We reserve the right to change the product and the manual with-
out notice.
Installation
1. Before drilling a hole for air control, maker sure the surface is flat, so the Slimline air control will have the best
surface to seal against.
2. Drill a hole according to recommended hole size.
3. Align window on handle/stem assembly (5) with the MIN position. Place the palm of the hand against the top of
the Slimline air control handle and press down firmly, rotating the handle counter clockwise about a quarter turn.
4. Grasp the outer edges of the handle with your fingertips and pull the handle from
the outer body (3). Remove check valve ball (4) from outer body (3).
5. Place silicone on backside of flange of outer body (3) and install through hole in
tub/spa.
6. Place gasket (2) onto body of the outside of tub/spa wall.
7. Hand tighten nut (1) onto body.
8. Glue 20/32 mm hose in socket of air control.
Important: Make sure check valve ball (4) was removed to avoid excess glue from
interfering with check valve operations.
9. Remove excess silicone from around flange of air control and surface of tub/spa.
10. Once glue is dry reinstall check valve ball (4).
11. Insert handle/stem assembly (5) into outer body (3) with the window on the handle
in the “MAX” position.
12. Once the handle/stem assembly (5) is in the outer body (3), press on the top
surface of the handle firmly and rotate the handle clockwise until it stops
(approx ¼ turn).
13. Check the MAX and MIN position through the window on the top of the handle and
match with the operation of the jets. If aeration occurs in the MIN position, the
Slimline air control has been improperly assembled. To correct, press down
firmly on the handle and rotate again clockwise. Recheck the MAX and MIN
position with the operation of the jets.
Warning
Do not use any type of petroleum based lubricant, they will damage the product.
49-10-2310CEC
ITT HydroAir, February 2006
1.
2.
3.
4.
5.
Page view 0
1 2

Summary of Contents

Page 1 - 40725 Rev A July 30, 2009

40725 Rev A July 30, 2009SLIMLINE AIR CONTROLS 10-2310-(-) & 10-2510-(-)MaterialWhite ABS/grey ABS Dimensions Hole size Socket size 10-2510-

Page 2

1.2.3.4.5.RÉGLAGES D’ADMISSION D'AIR SLIMLINE 10-2310-(-) & 10-2510-(-)MatériauxABS blanc/ABS gris Dimensions Diamètres de perçage c

Comments to this Manuals

No comments